Winter has arrived, and many vinyl sheet flooring construction projects are planned to be carried out before the Spring Festival. Therefore, the work pressure of engineering management projects is very high, and community owners often stipulate that each construction technology enterprise must ensure product quality issues for analysis of architectural design projects, without considering whether construction safety standards are met.
In order to better obtain the daily work tasks of floor construction personnel, various construction technology enterprises must strictly follow the regulations of PVC floor construction production and processing technology in floor construction management. They cannot blindly follow the trend, shorten the construction period, or neglect the construction quality standards, otherwise the damage caused will be incalculable. Therefore, everyone reminds everyone once again.
During the ultra-low temperature period, measures should be taken to avoid and avoid construction defects. The reasons are as follows:
Even after construction, it is easy for the bottom to become hard or soft due to nighttime temperature differences or other temperature differences.
To avoid sound construction under adverse factors, the following countermeasures should be adopted:
Weak ground conditions, common psychological problems during ground engineering construction:
The drying period in winter is 2-3 times later than in summer (at least an additional drying period of 3-4 weeks is required);
Even if the surface layer appears to have dried early, the inner part of the decorative material may still not be completely dry, and there is a risk of moisture exposure after construction;
Before construction, store the adhesive and PVC floor in a warm area so that the packaging of the floor decoration materials can be stamped and repaired.